The size and shape of the room
Run length, not floor area, sets the cabinetry cost. A galley with six metres of run can cost more than a large square room with two walls of glazing. Tall banks, islands and pantries add run; open walls remove it.
Every kitchen we build is individually priced against a surveyed room — so instead of a headline number that collapses at the first site visit, here is exactly what moves the figure up and down, and how to get a real one for your own space within 12 hours.
Indicative price within 12 hours.
Run length, not floor area, sets the cabinetry cost. A galley with six metres of run can cost more than a large square room with two walls of glazing. Tall banks, islands and pantries add run; open walls remove it.
Carcass material, drawer-box quality and finish decide the bulk of the figure. Hand-sprayed and hand-finished fronts, veneers and fluted or curved detail sit above a flat matt lacquer. Handleless and shadow-gap details take more workshop hours.
Quartz, porcelain, granite and natural marble sit at very different levels, and so do thickness, mitred edges, waterfall returns, full-height splashbacks and bookmatched veining. Slab selection and templating are always priced against the actual stone.
Appliances are frequently a fifth of a project. Integrated columns, wine cabinets, boiling taps, extraction and specialist ventilation change both the appliance line and the cabinetry built to house them.
Moving services, re-plastering, flooring, electrics, plumbing alterations, making good and waste removal. We identify these at survey so they are in the number from the start rather than arriving as variations mid-install.
Lift-only access, listed interiors, permit bays, estate working hours and lower-ground levels all affect install time. London projects live or die on this and it belongs in the price, not in a surprise invoice.
There is no showroom margin, no franchise fee and no subcontracted fitting mark-up in a Dominus price. You pay for cabinetry and labour, not a high-street lease.
Drawer boxes, hinges, runners and worktop are used daily. Put budget there and take it out of decorative elements that only affect one wall.
The same kitchen can be specified with very different appliance packages. We price it both ways so the decision is yours, not a default.
Most overspend is variations. A proper survey and full drawings before manufacture means the figure you sign is the figure you pay.
A private, no-obligation consultation with a senior member of the atelier — in your home or at our London studio. A limited number of private commissions each year.